In the historic Berolinahaus building at Alexanderplatz 1 in Berlin, LIST Construction added two floors for tenants. The client was Pegasus Grundstücksentwicklung und Beteiligung GmbH.
The new building, which covers approximately 16,500 square meters, was completed in ten months and consists of four units, each with 200 square meters of office space.
A distinctive feature is the facade: a curtain wall facade that, thanks to wooden elements and a skylight strip, appears more attractive than conventional facades. Wood, an alternative building material, was used for the roof structure. The clear height measured eight meters to the lower edge of the glued-laminated timber beams. In terms of sustainability, the project also aimed to achieve a DGNB Gold certification.
LIST Construction handled the submission of the building permit application and relied on BIM methodology throughout the entire project. LIST’s in-house engineering firm was responsible for the architectural design as well as all building services for the property.
LIST Construction has won the City of Krefeld’s competitive negotiation process with a call for proposals for the construction of a new fire station for the volunteer fire department.
In Kelsterbach, LIST is carrying out the construction of the “LogiSpace” logistics park for LogiSpace GmbH & Co. KG—a joint venture between Fraport and MB Park Deutschland.
LIST Construction constructed a new two-court sports hall on Zeisigstraße in Hamburg. The existing hall was first demolished and then rebuilt to be twice as large.
We use cookies, for example, to offer social media features or to analyze traffic to our website. By continuing to use our website, you consent to our use of cookies. To continue, you must make a selection.
For more information on data protection and cookies, please see our Privacy Policy. You can enable or disable specific options under Settings.