Krefeld Fire Station
LIST Construction has won the competitive bidding process conducted by the City of Krefeld for the construction of a new fire station for the volunteer fire department.
Together with LIST Eco and LIST Ingenieure, LIST will serve as the general contractor, handling the design, planning, and turnkey construction. The contract also includes a five-year maintenance agreement. The plan is for a two-story building centered around a vehicle bay for four vehicles: The ground floor will house a wash bay, changing rooms, break rooms, restrooms, storage, and utility areas, among other facilities; the upper floor will feature meeting rooms, offices, additional utility and storage rooms, restrooms, and kitchen areas. The interior finish is minimalist, so the requirements for MEP and building automation are correspondingly high.
The design follows the Cradle-to-Cradle approach with a focus on reuse and material-specific separability. The use of ten Cradle to Cradle materials is planned. The fire station will be constructed using a hybrid timber structure, supplemented by CO₂-reduced concrete and/or R-concrete. The façade will be clad with reused clinker bricks. A green roof (extensive and intensive) and a PV system are planned. The project aims to achieve DGNB Gold (DGNB Flex) and QNG certification.