Warstein Laboratory Building
LIST Construction is constructing a new turnkey research and laboratory building in Warstein on behalf of GARBE to complement Infineon's headquarters.
The project expands the existing R&D and office space and also includes ELT laboratories.
The plan calls for a full-height glass curtain wall using a mullion-transom system covering approximately 4,500 square meters. The total gross floor area will be approximately 12,370 square meters, distributed across one basement level and six full stories. Starting on the first floor, a hybrid construction method combining wood and concrete will be used: featuring glulam columns, composite beams, and wood floors with a 12-cm concrete overlay—the exposed wood surfaces define the building’s distinctive appearance.
The building is being constructed to the EE40 standard and is designed to achieve BREEAM “Excellent” certification. LIST Ingenieure is providing support for the building’s mechanical, electrical, and plumbing systems.