Production Hall Esslingen
The technology park in Esslingen has been expanded to include a new industrial property.
On behalf of greenfield development, LIST Construction constructed a two-story production facility (approx. 8,000 square meters of gross floor area) along with a five-story administrative building (approx. 2,000 square meters of gross floor area), which is connected to the production facility by a walkway.
The new building was handed over on a turnkey basis and fully customized to meet the needs of the tenant, Daimler. The building’s unique feature lies in its floor layout: Production takes place not only at ground level but is distributed across two superimposed floors, each measuring 4,000 square meters. In addition, the hall floor was specially sealed in accordance with the German Water Resources Act (WHG) to prevent the penetration of water-polluting substances into the subsoil in the event of an emergency.
The in-house planning firm LIST Ingenieure became involved in the project as early as the bidding phase and advised the client on building services engineering. This enabled various optimizations to be achieved in the areas of ventilation, heating, and cooling.