production facility Esslingen
The technology park in Esslingen has been expanded to include a new industrial property.
On behalf of greenfield development, LIST Construction constructed a two-story production hall (approx. 8,000 sqm GFA) with a five-story administration building (approx. 2,000 sqm GFA), which is connected to the hall by a passageway.
The new building was handed over on a turnkey basis and fully adapted to the needs of the tenant, Daimler. The special feature of the building is its number of floors: production takes place not only at ground level, but also on two 4,000 sqm floors above each other. In addition, the hall floor was specially sealed in accordance with WHG (German Water Management Act) to prevent water-polluting substances from penetrating the subsoil in the event of an emergency.
The in-house planning company LIST Ingenieure joined the project during the tender phase and advised the client on technical building equipment. This enabled various optimizations to be achieved in the areas of ventilation, heating, and cooling.