Office and commercial building Hanover Vahrenwald
An innovative cutter soil mixing process was used for the excavation pit shoring.
In Vahrenwald-List, Hanover's most populous district, LIST Construction has completed a turnkey office and commercial building. The result is a 25,000 sqm complex with five above-ground floors and two underground parking levels, which will contribute to strengthening the district. The property was developed by LIST Develop Commercial in close cooperation with the city of Hanover. dm and REWE have each opened a store on the ground floor. Design Offices, a provider of coworking spaces, moved into a total of 6,700 square meters, extending from the ground floor to the second floor. The economy hotel chain B&B Hotels is located on the third and fourth floors and offers guests almost 150 rooms. Two underground car parks with a total of approx. 180 parking spaces were built in the basement. To prevent groundwater from penetrating, LIST Bau Nordhorn used the innovative cutter soil mixing method to construct walls as excavation pit shoring. The excavation pit walls are around 22 m deep. LIST Ingenieure was responsible for the technical building equipment.