logistics center Upper House
A new logistics center covering around 20,000 square meters was built in the industrial area of Oberhausen. LIST Bau was commissioned by Verdion to construct the turnkey building.
The property was built on a brownfield site in the industrial area of Oberhausen. It also has 2,045 square meters of mezzanine space and 544 square meters of office space. The important aspect of sustainability was underpinned by the aim of achieving DGNB Gold certification. In addition, there is a special feature that was taken into account during Construction: Because the property was built on a brownfield site, complex contamination was encountered in the soil. LIST Construction therefore involved the civil engineer at an early stage. LIST's in-house engineering company, LIST Ingenieure, was responsible for the entire architectural and MEP planning for this project. The planning was fully supported by the BIM method.