Warstein laboratory building
LIST Construction is constructing a new turnkey research and laboratory building in Warstein on behalf of GARBE to complement Infineon's headquarters.
The project expands the existing R&D and office space and also includes clean room laboratories.
A complete glass façade in a mullion-transom system covering around 4,500 square meters is planned. A total of approximately 13,100 square meters of gross floor area will be created, spread over a basement and six full floors. From the first floor upwards, a hybrid construction method using wood and concrete will be used: with glulam columns, composite beams, and wooden ceilings with 12 cm of concrete – the visible wooden surfaces characterize the building's distinctive appearance.
In close cooperation with LIST Eco, the building will be constructed in accordance with the EE40 standard and will be designed to achieve BREEAM "Excellent" certification. LIST Ingenieure is providing support for the technical building equipment.