Expansion of cold chain logistics Hamburg
LIST Bau expanded an existing logistics facility in Hamburg for Transgourmet Deutschland GmbH & Co. OHG. The existing building was constructed by LIST Bau in 2018.
The logistics facility remained in operation during the construction and renovation work. Fresh food is also processed at this location, which placed special hygiene requirements on the interior revitalization. Due to the location of the property, groundwater played a major role and had to be taken into account in the special foundation. LIST Construction proposed changes to the static system with molded foundations, which resulted in time and cost savings. The in-house engineering company, LIST Ingenieure, provided the BIM model for the property.