Production and Logistics Center Eschbach
A new corporate facility has been built in Eschbach, near Freiburg.
On behalf of the project developer IXOCON, LIST Bau Stuttgart constructed a property measuring approximately 18,500 square meters, featuring a production and logistics area as well as a three-story administrative building.
The building’s unique feature lies in its floor layout: production took place on a total of two levels. The upper-level spaces are connected to the adjacent administrative building via a connecting wing. The production and logistics center was occupied by Avnet Embedded (Freiburg) GmbH.
The building was constructed to Efficiency Class 40 standards, and the goal was to achieve DGNB Gold certification. The in-house engineering firm LIST Ingenieure was responsible for the building’s technical systems. The developed concept includes a well system for heating and cooling, a battery-buffered photovoltaic system, and renewable energy generation via a water-source heat pump.