distribution center Holzgerlingen
LIST Bau completed the construction of this new distribution warehouse in Holzgerlingen in just six and a half months.
A 12,200 sqm turnkey hall with a central partition has been built in a convenient location, with a storage area supplemented by an approximately 850 sqm mezzanine level. In addition, around 900 sqm is available for offices and social rooms.
In order to enable punctual handover, it was necessary to draw up a tightly scheduled timetable and adhere to it during implementation. A special structural feature was created on the side of the distribution warehouse: a 520 sqm loading tunnel is used to load arriving trucks with goods without causing excessive noise pollution for the surrounding area.
The property does not require fossil fuels for its operation. The operation of an air-to-air heat pump is supported by the installation of a photovoltaic system. The construction of reinforced facade insulation also enabled the building to be constructed in accordance with the GEG-40 standard. The property is aiming for DGNB Gold certification.