Distribution Center Holzgerlingen
In just six and a half months, LIST Bau completed construction of this new distribution warehouse in Holzgerlingen.
Conveniently located, a 12,200-square-meter turnkey warehouse—divided down the middle—has been constructed, with its storage area supplemented by a mezzanine level measuring approximately 850 square meters. In addition, approximately 900 square meters are available for offices and break rooms.
To ensure on-time handover, it was necessary to establish a tightly scheduled timeline and adhere to it during construction. A unique architectural feature was added to the side of the distribution warehouse: a loading tunnel measuring approximately 520 square meters is used to load incoming trucks with goods without causing significant noise pollution to the surrounding area.
The property operates without the use of fossil fuels. The operation of an air-to-air heat pump is supported by the installation of a photovoltaic system. The installation of reinforced facade insulation also made it possible to construct the building in accordance with the GEG-40 standard. The goal is to achieve DGNB Gold certification for the property.