Battery Storage Berkhof
In Berkhof, LIST Bau has completed a new logistics center consisting of two warehouses for bauwo Grundstücksgesellschaft. The facility is used for the storage and transportation of batteries.
Safety is a top priority at this property. To ensure this, several early-warning systems have been integrated, and sprinkler tanks and a spacious technical control center have been installed. There is also a smoke extraction system, sprinkler systems, autonomous forklifts, and blacked-out skylights. In addition, approximately 4,000 thermal imaging cameras have been installed on the storage racks. These can detect at an early stage if a battery is overheating. Should this occur, the autonomous forklifts transport the battery to the dedicated emergency containers.
The in-house engineering firm LIST Ingenieure was involved in the permitting and construction planning and was also responsible for the BIM model for this project.